Indore's metro is planned as one Yellow Line that closes into a loop of about 33.5 km with 29 stations. Today the public part runs from Devi Ahilya Bai Holkar Terminal in the Super Corridor area to Radisson Square at Malviya Nagar: 16 stations over about 17 km.
The first short stretch of five stations opened on 31 May 2025. The longer section to Radisson Square followed on 6 September 2026. The stations beyond it, towards Rajwada, Indore Junction and the Airport, are still being built, and no opening dates are published here.
On Monday to Saturday trains run from 7:30 AM to 9:30 PM at gaps of about 45 minutes. Sundays and public holidays have shorter hours. Fares in the Indore guide are approximate slabs from Rs 10 to Rs 60, because the revised official chart was still awaited when we last looked.
The line is run by MPMRCL, the same state corporation that runs the Bhopal metro. Station pages, gate numbers and the journey planner live in the dedicated Indore guide.